CITY OF LARCHMONT
Larchmont WWTP is owned and operated by Consolidated Utilies,
a privately held company located in Savannah, Georgia.
RATIONALE FOR AMTS UPGRADE:
Larchmont determined that a system upgrade was necessary because (1)
the population served and the related daily flow rates were increasing
substantially from approximately 0.3 mgd to 0.6 mgd. In addition, a
more demanding and stringent discharge permit was implemented by the
Georgia Department of Environmental Quality (GDEQ).
New requirements for treatment were becoming more stringent such that
Biochemical Oxygen Demand (“BOD”) was to be discharged at
levels not to exceed of 10 mg/l, Total Suspended Solids (“TSS”)
were to be discharged at levels not to exceed of 20 mg/l, Ammonia (NH3)
was to be discharged at levels not to exceed of 5 mg/ and Fecal Coliform
was to be discharged at levels not to exceed of 200 mg/l.
Without changed practices, compliance by Larchmont with more stringent
standards from GDEQ, at more than twice the daily flow rate, was regarded
as improbable.
Larchmont was impressed with the performance history of ADS and the
predicted capability of AMTS to provide solid year round performance
and to substantially reduce the high cost associated with periodic sludge
disposal. Briefly, AMTS provides the quality treatment of mechanical
plants in lagoons at significant savings in capital and operating costs.
The AMTS process combines ADS’s proprietary diffusion aeration
products, engineered surface area (“AquaMats® ”) and
bioaugmentation (“Bacta-Pur®”) technologies to form
a very stable, and low-maintenance integrated system for natural microbial
treatment of municipal wastewater. Because of the efficiency of AMTS,
sludge handling is typically not necessary for up to 10 years or longer.
Larchmont considered a number of different proposals and selected the
AMTS from ADS because it offered the most impressive performance at
low capital and O & M costs, all supported by a 5-year performance
guarantee.
DESCRIPTION OF AMTS UPGRADE:
The
basic goal of the AMTS for Larchmont was to convert and upgrade the
existing facilities to a high performance lagoon system so that discharge
requirements were consistently achieved with a comfortable margin.
Above ground header pipe and high efficiency diffusion aeration tubing
were laid across the width of all primary and second lagoons. Baffles
were installed in each primary and secondary lagoons. The primary lagoons
were also equipped with Bacta-Pur® BactivatorsTM to continuously
supply a metered and activated quantity of XLG, a Bacta-Pur® sludge
digesting product.
AMTS COSTS---CAPITAL, OPERATING AND MAINTENANCE:
Capital costs incurred by Larchmont for the AMTS upgrade were approximately
$200,000 in equipment and installation related services.
REFERENCES:
Mr. Kim Abbott
Plant Operator
Consolidated Utilities
119 West Ogelthorpe
Savannah, GA 31401
Phone: (912) 233-3254
Fax: (912) 233-5654
|
Ron Kolat, P.E.
Carter & Sloope Engineering
31 Park of Commerce Way
Suite 2000B
Savannah, Georgia 31405
Phone: (912) 447-5119
Fax: (912) 447-6663
rkolat@carter&sloope.com |